Distributor Road (£100M)

Distributor Road (£100M) Back to case studies Our client initially required the support of a planner to develop a programme from the very early stages of this £100M plus distributor road in the Midlands. The team required someone to work with the local authority (our client’s client) to understand the programme and associated risks. This […]
Relief Road (£50M)

Relief Road (£50M) Back to case studies The client required a recovery programme and series of Compensation Event programmes for this section of single carriageway crossing a river and a railway. Project Planning were asked to take on the planning duties as the existing programme did not fulfil the client’s high expectations. Our first task […]
M1 Bridge to Growth

M1 Bridge to Growth Back to case studies Our services were employed to produce the tender programme to construct a new road bridge across 10 lanes of the M1 in Leicestershire. Our client’s internal planners maintained the programme through the early stages of the project, but our services were employed after several months due to […]
Whitley Junction

Whitley Junction Back to case studies Our planning services were required to convert the tender programme into a Clause 31 and subsequent Clause 32 programme for this NEC Target Cost contract. The new bridge and junction remodelling involved detailed planning around new constraints introduced post-tender programme, including access and traffic management. Revised phasing drawings were […]
New Street Station

New Street Station Back to case studies Our team assisted in the day-to-day programming and possession planning of the platform refurbishments and conducted a thorough delay analysis of the refurbishment. We included the construction of a new pedestrian footbridge in our delay analysis. The comprehensive set of records held by our client meant that we […]
A43 Corby Link Road

A43 Corby Link Road Back to case studies The A43 Corby Link Road scheme entails the construction of four miles (6.5km) of dual carriageway between the A6003 and Stanion roundabout, including the construction of three new over bridges and new culverts. The client for the scheme was the Northampton County Council and the project value […]
A41 Grade Separated Interchange

A41 Grade Separated Interchange Back to case studies The project involves the creation of a dual-carriageway underpass, beneath an improved roundabout in West Bromwich. The construction work was programmed and delivered to cause as little disruption to traffic flow as possible. We were initially appointed by to provide planning support mid-way through the construction work, […]