Planning Support on Urban Highway Works Reduced Delay and CE Backlog

Proactive Planning Support on £25M Urban Highway Works Reduced Delay and CE Backlog Back to case studies After successfully completing the programming works for the first phase of a major bus route enhancement into the centre of one of the UK’s largest cities, Project Planning were invited to produce the tender programme for the next […]

Carriageway Dualling Tender

Single Carriageway to Dual Carriageway Conversion The Challenge Our client, a Tier 1 contractor, was bidding for an NEC4 contract to upgrade an existing single carriageway to a dual carriageway and to modify nine junctions along the route.  A robust, well considered programme was required to support their tender submission. We were engaged to develop […]

Social Housing Upgrade

Social Housing Decarbonisation Project Planning Ltd. was appointed by a national main housing contractor to support the Social Housing  Decarbonisation Works to 450 residential properties across multiple sites in England. This complex project came under the PAS 2035 standards and required careful planning and coordination of management and labour resources, with a specific emphasis on maintaining continuous […]

New Street Station

Birmingham New Street station

New Street Station Back to case studies Our team assisted in the day-to-day programming and possession planning of the platform refurbishments and conducted a thorough delay analysis of the refurbishment.  We included the construction of a new pedestrian footbridge in our delay analysis. The comprehensive set of records held by our client meant that we […]

A43 Corby Link Road

a43 Corby

A43 Corby Link Road Back to case studies The A43 Corby Link Road scheme entails the construction of four miles (6.5km) of dual carriageway between the A6003 and Stanion roundabout, including the construction of three new over bridges and new culverts. The client for the scheme was the Northampton County Council and the project value […]

A41 Grade Separated Interchange

A41 Grade Separated Interchange Back to case studies The project involves the creation of a dual-carriageway underpass, beneath an improved roundabout in West Bromwich. The construction work was programmed and delivered to cause as little disruption to traffic flow as possible. We were initially appointed by to provide planning support mid-way through the construction work, […]

Stratford Parkway Station

Stratford Parkway Station Back to case studies Stratford Parkway Station involves the construction of a new railway station adjacent to the existing bus-based Stratford Park and Ride in Bishopton. Vehicular access to the station will be via the Park and Ride entrance. The station will have disabled parking, taxi rank and passenger drop-off/pick-up facilities, as […]

Distributor Road (£100M)

Distributor Road (£100M) Back to case studies Our client initially required the support of a planner to develop a programme from the very early stages of this £100M plus distributor road in the Midlands.  The team required someone to work with the local authority (our client’s client) to understand the programme and associated risks.  This […]

Relief Road (£50M)

Relief Road

Relief Road (£50M) Back to case studies The client required a recovery programme and series of Compensation Event programmes for this section of single carriageway crossing a river and a railway.  Project Planning were asked to take on the planning duties as the existing programme did not fulfil the client’s high expectations. Our first task […]

Doncaster Quality Streets

Public Realm

Doncaster Quality Streets Back to case studies Project Planning Ltd were hired to produce the tender programme within a short time for this streetscaping scheme.  The scheme required us to work closely with the traffic management team to ensure traffic could flow as the scheme was built. The tender programme was updated at contract award […]